Specifiion For Crushing Type- Crusher Machine
SECTION 304 3.3.2 A stockpile of acceptable material, as described in 3.5, equal to at least 20 percent of the bid quantity or 5,000 yd3 (4000 m3), whichever is less, shall be constructed before the hauling and placing phase of the work begins.The stockpile shall be maintained until approximately 80 percent of the quantity has been placed. 3.3.3 …