Safety Guideline on Operation and Maintenance of …
3.3.4 Belt joint (Vulcanized or Mechanical) Before starting the repairing or preparing of belt joint follow steps i, ii, & iii of section 3.3.1. i. Fix the jam angle with deck plate/ stringer at a sufficient free length (3 m to 5 m from the joint), towards head end of the conveyor belt. ii.
قرأ أكثر